Licensed & Insured —Call (425) 583-9503

Our Services

New Construction Electrical

Built right from the ground up.

5 Google·Licensed·Same-Day·Upfront
New Construction

Overview

New Construction Electrical

Built right from the ground up.

New construction electrical in Seattle: full rough-in to trim-out, 200A service, smart-home pre-wire, EV-ready conduit, code-compliant and inspection-ready. Working with builders and homeowner-builders across King and Snohomish County.

There are two ways a new house gets its electrical system done. One is a contractor with a clipboard and a fast-stapler who hits the rough-in deadline by an inch and leaves you fighting code corrections through trim-out. The other is a partnership — where the electrician shows up at framing with the GC's plan in hand, asks where you actually want the recessed lights instead of guessing, and runs everything once.

New construction electrical in Seattle is what we do day-in-day-out for builders, custom-home GCs, and homeowner-builders across King and Snohomish County. The system you build now is the one you'll live with for 30 years; we treat it like that.

Mad Dog Electric is a licensed Washington electrical contractor. We take on full residential new builds (single-family, ADUs, DADUs, custom homes) and additions where the wiring is essentially a new build. Every project is permitted with L&I, runs against current NEC and Seattle DCI requirements, and gets inspected at rough and final.

  • Full rough-in to trim-out residential electrical
  • 200A or 400A service, panel, and grounding
  • Smart-home pre-wire (Lutron, structured cable)
  • EV-ready conduit + solar/battery readiness
  • ADU/DADU sub-panels and dedicated services

Why Mad Dog

Why Choose Us for New Construction

Plan Review First

We sit down with architect plans before framing. Cheapest time to make changes is before any wire is in the wall.

Smart-Home & EV Ready

EV-ready conduit, structured wiring, Lutron-ready switches with neutrals, solar/battery readiness — at rough-in, not as a retrofit.

200A as Standard

We default to 200A on every single-family build. EV + heat pump + induction + dryer adds up fast — 100A is at capacity before lights turn on.

Coordinates With Your GC

Rough-in starts within 5 business days of framing inspection. We schedule and meet inspections ourselves so the build doesn't stall.

Do You Need This?

Signs You Need New Construction

What "new construction electrical" includes — the three phases:

  • Pre-construction & plan review — load calc, panel placement, recessed light layout, smoke/CO detector locations
  • Rough-in (after framing, before insulation/drywall) — boxes set, cable run, service entrance and panel installed, rough inspection
  • Trim-out (after paint) — devices, fixtures, GFCI/AFCI outlets, smoke/CO detectors, recessed light trims, panel labeled, final inspection

The Mad Dog Guarantee

Six Guarantees, Zero Fine Print

  • Licensed, Bonded & Insured
  • Lifetime Workmanship Warranty
  • No Price Change Guarantee
  • Same-Day Free Estimates
  • Background-Checked Pack
  • Locally Owned & Operated

How It Works

Our Simple Process

1

Plan Review

We sit down with the architect's plans, do the load calc, and mark up panel placement, lighting, and rough-in details before any wire goes in.

2

Rough-In

Boxes set, cable run, service entrance and panel installed, structured cable for low-voltage, EV-ready conduit. Rough inspection signed off.

3

Trim-Out

Devices, fixtures, GFCI/AFCI outlets, smoke/CO detectors, recessed light trims, dimmers, smart switches. Panel fully labeled.

4

Final Inspection

L&I final inspection — we meet the inspector. Final walk-through with the GC and homeowner. Documentation handed over.

Real Pricing

What New Construction Cost in Seattle

Rough order of magnitude on a single-family build in 2026 (we always quote line-by-line against the plan):

1,500–2,500 sq ft, 200A, standard

$11,000 – $18,000

Full electrical, rough through trim

2,500–4,000 sq ft, smart-home pre-wire

$18,000 – $32,000

Lutron, structured cable, EV-ready

4,000+ sq ft, 400A service

$32,000 – $55,000

Full smart panel, EV-ready, solar-ready

ADU/DADU (typical)

$6,500 – $11,000

Sub-panel from main + full rough-trim

Variables: number of recessed lights, under-cabinet and landscape lighting, generator pre-wire, smart switches, fixture grade. Itemized against the plan.

Permits & Code

Permitted, Inspected, Done Right

Every new residential electrical job in Washington requires an L&I permit and at minimum two inspections (rough and final). Seattle properties under DCI also follow local amendments. Common items that catch builders off-guard: tamper-resistant receptacles required everywhere, AFCI breakers on most 15A/20A circuits in habitable rooms, GFCI in kitchens/baths/garages/outdoors, EV-ready conduit requirements appearing in some jurisdictions, smoke + CO detector placement and interconnection per current code. We handle all of it.

Google Review
We hired Mad Dog for the electrical on our new ADU build. They coordinated with our contractor seamlessly, passed every inspection on the first try. Couldn't be happier.
B

Brian & Amy P.

Everett, WA · New Construction

Financing Available

Low monthly payments. 0% APR options for qualified customers.

FAQ

Frequently Asked
Questions

Service Area

New Construction Electrical Across the
Greater Seattle Area

Serving Seattle, Bellevue, Kirkland, Redmond, Everett, Issaquah, Sammamish, and the rest of the Eastside and Snohomish County.

View All Service Areas
Free · No Obligation

Ready to Get Started?

Get a free estimate on your next electrical project. No pressure, no hidden fees — just honest answers from your neighborhood pack.

(425) 583-9503
Call Now